TATLIN NEWS #48
The need for industrial optimization led to the fact that already at the design stage the ar- chitects decided to use modular casting sys- tem. For instance, light aluminium modules containing infrastructure are embedded into the structure of main building. This system allowed to ease the construction process and cut costs. The console elements were also de- signed on the basis of light-steel frame, as the protrude from the building rather far. Us- ing these new construction methods changed the interior as well: the architects managed to make the walls a little thinner, but to do that they had to make all the walls carrying, So no reconfigurations are possible in the house. The variability was sacrificed in the name of simplicity of construction (the ‘detachable’ modules can be put together and installed in just one day), convenience of infrastructure and extravagant appearance. object 102 Dwellings | location Madrid, Spain | development started 2004 | con- struction finished 2007 | architects Dos- masuno Arquitectos (Ignacio Borrego, N é stor Montenegro and Lina Toro)
ТАТLIN news 6|48|65 2008 127
Made with FlippingBook - professional solution for displaying marketing and sales documents online